Which areas do you cover?
All of Karnataka, in all five ESCOM areas: BESCOM (Bengaluru and surrounding districts), MESCOM (Mangaluru, the coast and Malnad), CESC (Mysuru and the southern districts), HESCOM (Hubballi, Belagavi and nearby districts) and GESCOM (Kalaburagi and Kalyana Karnataka). Our office is in Navalgund, Dharwad district.
Can you handle only the ESCOM or CEIG approvals if another contractor did the wiring?
Yes. We first inspect and test the installation, list anything that must be corrected, and then prepare and submit the file. We can also carry out those corrections so the inspection passes the first time.
When do I need an HT connection instead of LT?
When your required load goes above the LT limit set in the KERC Electricity Supply Code for your category, the supply is given at HT (usually 11 kV, sometimes 33 kV) with your own transformer. Very large loads are supplied at 66 kV or above through KPTCL. We calculate your load and tell you which applies.
When is CEIG / Electrical Inspectorate approval required?
Generally for HT installations, transformers, generators above specified capacity and other installations covered by the CEA (Measures relating to Safety and Electric Supply) Regulations, 2023. Some installations can be self-certified. We check your project against the current rules during the site visit.
How long does a new electricity connection take?
A simple LT connection with a complete file can move quickly. HT connections take longer because they involve feasibility, estimates, CEIG drawing approval, installation, inspection and metering. After the site visit we give you a stage-wise timeline and update you at each stage.
What documents are needed for a new electricity connection?
Typically proof of ownership or lease, applicant ID and address proof, building plan approval or occupancy certificate where applicable, a wiring completion and test report from a licensed electrical contractor, and load details. HT connections also need drawings and equipment test certificates.
What is load enhancement and do I need it?
Load enhancement is getting your sanctioned load increased when you add equipment such as ACs, machines, lifts or EV chargers. Running more load than sanctioned can attract penalties and overheat cables and meters. We calculate the new load, apply to your ESCOM and carry out any upgrades.
Do you work on residential layouts and DTCs?
Yes. For plotted layouts we design and execute the HT line extension, distribution transformer centres (DTCs), the LT network and street lighting under ESCOM supervision, and coordinate the handover of the network to the ESCOM.
Do you prepare an estimate and BOQ before we commit?
Yes. You get an itemised bill of quantities with material, labour and statutory charges shown separately, so you can compare quotes on the same basis.
Are you a licensed electrical contractor?
Yes. All installation work is carried out and certified under a valid electrical contractor licence, with competent supervisors and wiremen as required by the Karnataka licensing rules. Licence details are shown in the contact section.
Do you offer maintenance after commissioning?
We offer annual maintenance contracts covering preventive maintenance of HT/LT panels, transformers and earthing, periodic testing, maintenance records for inspections, and breakdown support.
Can you help with DG set installation and approval?
Yes. We install DG sets with changeover panels and interlocks that prevent back-feeding into the ESCOM network, carry out neutral and body earthing, and handle the Inspectorate approval where it applies.